Intro

MnDOT has offered to transfer the 1.8-mile Dellwood segment of Trunk Highway 244 (Dellwood Avenue) to the City, along with a one-time payment of $11,569,172. The City Council must decide whether to accept or decline. This page collects everything the City has published on the proposal and will be updated as the process continues.

What is a turnback?

MnDOT regularly reviews whether each state highway still serves a statewide purpose. When one no longer does, MnDOT offers it to the local government, with funding. This is called a jurisdictional transfer, or turnback. Washington County took over Highway 96 east (Dellwood Road) in a turnback in 2023.

Where things stand

  • MnDOT’s offer: the road plus $11.57M, usable for any road purpose in Dellwood.
  • The road’s original pre-1949 pavement has never been fully rebuilt, and MnDOT rates it “Poor.”
  • If the City declines, MnDOT expects a pavement overlay around 2030, and may reassign the payment after its fiscal year 2027 review.
  • No decision has been made. Legal questions are still being reviewed by the City’s legal counsel.
  • Next Council discussion: December 8, 2026.

Accept or decline: what changes

If the City accepts If the City declines
Who owns the road City of Dellwood MnDOT
Next major work The City decides, up to full reconstruction including drainage Overlay around 2030; base and drainage largely unchanged
Snowplowing City standard: City crews or a contract with Washington County or Mahtomedi MnDOT “Rural Commuter” standard (4 to 9 hour target); no written commitment
Routine upkeep City MnDOT, as needed; no set schedule
The $11.57M Paid to the City Reassigned by MnDOT

What it could cost taxpayers

It depends on how the City spends the payment. The City’s engineer and staff outlined three broad approaches:

  • Path A, rebuild the whole corridor: construction, engineering, right-of-way, and a pedestrian tunnel or crossing lights would cost about $11.6M, leaving essentially nothing for upkeep. The City would use municipal bonds to spread the cost over time rather than raise taxes or pay cash up front.
  • Path B, rebuild within the payment: reconstruction capped near $9.5M, leaving about $2.0M that could cover upkeep for 40 years in today’s dollars. Inflation and anything beyond the cap would be local costs.
  • Path C, preserve the road and invest the rest: reclaim and overlay now for about $2M. The remaining balance could go to storm drainage improvements, with the rest invested as state law allows. No new storm sewer or sidewalk unless paid from the balance.

These are planning-level estimates and are among many options the Council is still exploring and legally vetting.

A separate decision: Lake Links Trail

The Lake Links Trail is related but separate. The turnback only affects whether the City would own the trail’s right-of-way. Trail costs are not part of the $11.57M, though building both projects together could save money.

  • October 29 resident meeting materials
  • Background Documents
    • White paper/Residential information report (Doc: Final Version- White Paper)
    • Previous updates from Cara to the Council (Doc: 2026-05-12-Council-Memo), currently on website under Notices, Planning and Development (Highway 244 Jurisdictional Transfer – Supporting Information – April 14,2026)
    • Potential Transfer of Highway 244 (news, June 26)
    • Resident meeting announcement (news, September 21)
    • Council packets and minutes: Documents library, Highway 244 category
    • Previous updates from the Mayor to the Residents

Share your views

Complete the resident survey online at Dellwood Resident Survey.

Questions or corrections: Council Member Melissa Peltier, Melissa.Peltier@dellwood.us.

To get updates by email, sign up at https://www.dellwood.us/email-notifications.

This page is an informational summary, not an official position of the Dellwood City Council. Information is current as of October 29, 2026.